20th February, 2004
Greetings from Jakarta
As previously reported were commencing the installation
of a Fitch Fuel Catalyst on their Boiler Plant based on the success already
known in other Hotel Properties throughout Indonesia.
Knowing what the product can produce under “normal” operating
conditions, I was set to test the Fitch Fuel Catalyst under abnormally
high-carbonized Boiler conditions, which would demonstrate its ability
to clean or flush the Boilers internal surface areas without the use of
scrubbers, brushes or chemicals.
The pictorial results are shown below;
Before Installation |
After 48 Hours Operation |
|
|
|
|
|
|
Tube Condition Before Installation |
Tube Condition After Installation |
From the pictures above it is possible to see the difference in Boiler
conditions and the effect that occur when enhanced fuel quality, and balanced
O2 levels are supplied to the Boiler as the internal surface areas of
the pipes are perfectly clean allowing for maximum heat transfer during
boiler operation.
Continual monitoring of fuel consumption is being performed with expected
results due at the end of this month.
Director of Property Maintenance
Jakarta
September 2003
Greetings from Bali once again.
Please find attached the Diesel Fuel Results for the month end, August
2003-10-16
Month 2003 | Occupancy | Total Numbers | Fuel Consumption | Comment | April, 2003 | 27.6% | 11,990 Guests | 75,120 Litres | Before Installation | May 2003 | 18.4% | 8,548 Guests | 66,900 Litres | Trailed Installation | June 2003 | 26.4% | 11,743 Guests | 59,810 Litres | After Installation | July 2003 | 61.5% | 26,390 Guests | 67,900 Litres | After Installation | Aug 2003 | 48.9% | 22,099 Guests | 58,740 Litres | After Installation |
Considering the operating results from the above, we can calculate that
during the month of April, 2003 we achieved a fuel consumption of 6.26
Litres per guest per night, whilst last month, August, 2003, we only consumed
2.65 Litres per guest per night.
This equates to approximately 57.66% fuel efficiency savings for our
Boiler Plant.
Once again, the Fitch Fuel Catalyst not only has achieved the desired
fuel and environmental requirements but has also
‘maintained’ the results consecutively for the past four months
of installation.
Thank you
Director of Engineering
Bali
July 2003
Greetings once again from Bali
Please find attached the results from the End of Month Fuel Consumption
for the property, which has been adjusted to only record the fuel consumption
from before and after having the Fitch Fuel Catalyst installed on our
Boiler Plant.
I believe that the readings have now stabilized after both visually and
practically verifying that the fuel reductions achieved have been through
the installation of the Fitch Fuel Catalyst as the combustion in the Boiler
has improved dramatically. As a result we have recorded a 20.38% drop
in fuel consumption.
Finally, I note that the Stack Temperatures have decreased, the Smoke
Emissions have cleared and the internal sooting levels are only at a fraction
of the levels previous experienced.
Please feel free to use these fuel results as discussed, as I also have
no hesitation in welcoming you and your clients to inspect our Boiler
Plant at Bali, as we are pleased to be in association with
Pt. Fitch Indonesia.
Month 2003 |
Occupancy |
Total Numbers |
Fuel Consumption |
Comment |
April, 2003 |
27.6% |
11,990 Guests |
75,120 Litres |
Before Installation |
May, 2003 |
18.4% |
8,548 Guests |
66,900 Litres |
Trailed Installation |
June, 2003 |
26.4% |
11,743 Guests |
59,810 Litres |
After Installation |
Thank you
Director of Engineering