"CAGED!!"


 

WELL WE HAVE A JUMP ON THINGS AND HAVE COMPLETED THE GAS TANKS AND THE SIDE PANELS. WITH A FULL 9" STREACH THE SLEEKNESS OF THE BIKE BEGINS TO COME TO LIGHT. ALL ELECTRICAL BREAKERS AND JUNCTIONS WILL BE HOUSED BETWEEN THE TANKS ON SPECIAL BUILT MOUNTS. A LOT OF FORTHOUGHT HAS TO GO INTO THE BUILDING OF A CUSTOM TO HAVE EVERTHING IN THE RIGHT PLACE WHEN YOU ARE THROUGH.

 

THE TRIPLE TREES ARE BUILT BY US AND HOLD THE BRAKE LINES IN PLACE. THEY ARE JUNCTIONED TOGHETHER IN THE BOTTOM TREE TO GO TO BOTH SIDES. WE HAVE YET TO PUT THE HEADLIGHT MOUNTS WHERE WE WANT THEM. TWO SMALL SIGNAL LIGHTS WILL BE MOUNTED ON THE OUTSIDE CORNERS OF THE BOTTOM TREE. MOVING BACK TO THE SIDE PANELS, THE CUSTOM BUILT OIL TANK WILL HIDE UP INSIDE AND THE PANELS ARE WELDED TO THE FRAME ITSELF FOR A SMOOTH LOOK. IN ORDER TO COMPLETE PHASE "2" OF THE PROJECT, MOUNTS HAD TO BE INCORPORATED IN AHEAD OF TIME FOR SUPPORTS.

 

WE HAVE PUT THE KEY SWITCH AT THE REAR OF THE THE LEFT PANEL FOR EASY ACCESS WHEN YOU ARE SITTING ON THE BIKE. THIS WILL ALSO KEEP THE WIRING CLEAN AND OUT OF SIGHT. SPECIAL CARE MUST BE TAKEN TO ASSURE THAT ALL PANELS CLEAR ANTHING THAT MIGHT CHEW THEM UP WHEN THE BIKE IS RUNNUNG, SUCH AS THE CHAIN..ETC.

 

HERE IS A SHOT OF ONE OF THE MOUNTS WHICH WILL BOLT TO THE OIL TANK TO HELP SUPPORT THE LONG ENDS OF THE SIDE PANELS TO ELIMATE AND FLEXING THAT MAY OCCUR. EVERTHING MUST BE STRONG AND REINFORCED ON THIS RIDGED FRAME 96" BIKE!!

 

WE HAVE ALSO ADDED A STEERING STABILIZER UP FRONT TO HELP KEEP THE BIKE HANDLING STRONG AND STRAIGHT AS SHE ROCKETS DOWN THE ROAD. WE ARE STILL IN THE EARLY STAGES BUT WILL TRY TO KEEP YOU UPDATED AS WE GO.....HAVE A GREAT DAY!!!!

 

 


Page 1
Page 2
Page 3
Page 4
Page 5 (The Frame Gets Preped)
Page 6
Page 7 (She's Bad in Black!)
Page 8 (The Front End Gets Worked)
Page 9 (The Paint)
Page 10
Page 11 (The "Cage" Itself)
Page 12
Page 13 (The Spoiler Cage)
Page 14 (The Belt Gaurd Cage)
Page 15 (The Shift Lever and Chain Gaurd)

BACK TO RACK

INDEX